Mission Archive
Real-world expeditions testing the absolute limits of our technology in the most demanding environments on Earth.

Karakoram '23
Solar Battery Trial at 6,500m
Comprehensive field testing of CryoVolt battery systems paired with StratoSolar panels in extreme cold conditions. Successfully maintained power supply for communication and monitoring equipment throughout 45-day winter deployment.
Key Achievements
- Zero system failures
- 96% uptime in -40°C
- Exceeded power generation targets by 24%

Andes '24
Autonomous Comms Relay Test
Deployment of autonomous communication relay network across remote high-altitude locations. AeroLink systems maintained 99.7% connectivity despite severe weather patterns and terrain challenges.
Key Achievements
- 99.7% connectivity
- 50km range achieved
- Survived category-4 storm

Arctic '25
CryoSensor Endurance Program
Extended endurance testing of complete sensor suite in Arctic winter conditions. GeoPulse monitoring systems tracked environmental data and equipment performance through polar night.
Key Achievements
- 90 days continuous operation
- Temperature: -55°C minimum
- 100% data integrity maintained